Construction Test & Tag

Construction Site Test and Tag

Construction sites need testing every 3 months under AS/NZS 3012. Paul turns up on-site, gets through the gear quickly and hands over the paperwork on the day.

AS/NZS 3012 for construction

Construction and demolition sites have their own standard — AS/NZS 3012 — with shorter retest intervals and specific requirements for RCDs, leads and portable equipment.

On-site, fast turnaround

Paul works in with your site's schedule and doesn't slow trades down. Fail tags go on immediately so no one grabs a bad lead by accident.

What's included

  • AS/NZS 3012 compliant
  • 3-monthly cycle
  • Portable RCD testing
  • Lead & tool testing
  • Fail tags on the spot
  • Same-day documentation

Get a quote today

Call Paul directly for a fast, no-obligation quote.