Construction Test & Tag
Construction Site Test and Tag
Construction sites need testing every 3 months under AS/NZS 3012. Paul turns up on-site, gets through the gear quickly and hands over the paperwork on the day.
AS/NZS 3012 for construction
Construction and demolition sites have their own standard — AS/NZS 3012 — with shorter retest intervals and specific requirements for RCDs, leads and portable equipment.
On-site, fast turnaround
Paul works in with your site's schedule and doesn't slow trades down. Fail tags go on immediately so no one grabs a bad lead by accident.
What's included
- AS/NZS 3012 compliant
- 3-monthly cycle
- Portable RCD testing
- Lead & tool testing
- Fail tags on the spot
- Same-day documentation
Get a quote today
Call Paul directly for a fast, no-obligation quote.
